MANAGEMENT TEAM

Key personnel/ representatives of the company are as follows:

S/No Name Email Title Phone
1 Nwokorobia Edwin C. Chuksen05@gmail.com Managing Director 08033104331
2 Toni Ajinomissan turrex@yahoo.com chairman 08037789105
4 Egbula Onyeabor General Foreman 08037057843
3 Mike Dike MikeD.@hotmail.com Operations Manager 08033104331

The Managing Director/CEO - Engr. Eddie Chuks Nwokorobia. MNSE, MICE

He is the pioneer MD/CEO of the Company, from 2016 when it was formed to date.

Prior to this role he had accumulated well over 32- years of engineering practice, spanning from working in Engineering Design & Construction/supervision, Quality Assurance and Control to Project Management. He has been involved in numerous infrastructural facilities developments in Nigeria and abroad including:

    Indorama jetty, onne, phc: July 2015 – Dec.2015, where he was CIVIL/MECH SUPTD;

    Flowtex Contractors HDD ltd Aug. 2014 – dec.2014, where he was project manager in the construction of 18” dia gas pipeline from Forcados to Lagos ( Ijabo Ode axis);

    TOTAL P & E NIG LTD (TEPNG, 2011 to July 2014), where he was HEAD, QAQC, Oml58 Upgrade, Obagi, Field Logistics Base, where he played key roles in major project procurements/deliveries for the Field Logistics Base, obagi;

    Zakhem International Constr. Nig Ltd, 2008 – 2010, where he functioned as the Resident Project Quality Manager, Integrated Power Plant construction (Central Electric Project, EPC pkg 5, Pointe Noire, Congo;

    THE SHELL PETROLEUM DEVELOPMENT CO OF NIG LTD 1990 – 2008, where he was Contract Holder/Snr.Project Engineer in the Engineering Hub, responsible for construction of all Oil and gas infrastructures and maintenance: Design and construction of roads, bridges, pipe lines and storage tanks (oil and water), warehouses, structural steel workshops, Shore protection, dredging etc.;

    UMEZ ENGINEERING CONSTRUCTION. CO.LTD. OWERRI 1985-1990

    Project Engineer/ site Agent responsible for Isikwuator Okigwe Gully Erosion Control, Drainage Systems, internal roads, National Iron Ore Mining Township, Itakpe-Okene, Kogi State. Nigeria.

    NSE MEMBERSHIP AND PROFFISSIONAL ACTIVITIES

    1. Professional Membership/Activities
    2. The M.D was Chairman, PIFAC (Prevention, Investigation and Failure Analysis Committee, NSE, from (2010-2015).
    3. Corporate member, Nigerian Institution of Civil Engineers (2000)
    4. Registered Engineer, COREN (1993)
    5. Corporate Member, Nigerian Society of Engineers, MNSE (1993)
    6. Chairman Engineering Week Comitteee NSE, PH ( 1207 to 2014)

    List of PIFAC investigations carried out and reports submitted include :

    1. Rumumasi Overhed bridge/ Fly over, 2013
    2. Construction of Woji Road, 2014
    3. Nembe Water front Tetties Intergrity Survey
    4. Inspection of two-storey building at #13 Etche street Borikiri
    5. Port Harcourt

 

2 The Chief Engineer MANAGER - Joel Anako. B.ENG. M.ENG. MNSE

Joel was Civil/Structure Engineer; Operation & Security Camp (OSC)

OML 58 UPGRADE PROJECT PHASE 1

LOCATION: OBAGI RIVER STATE

DURATION: APRIL 2011 - DATE

JOB DESCRIPTION:

  • Supervise, Review and approve contractor deliverables for Civil and Structural Engineering e.g. Structural Calculation Reports, drawings, specifications for Accommodation Buildings, Technical Buildings, Security Buildings, Roads, Drainage system & other infrastructural facilities.

  • Review and approve vendor deliverables related to Civil and Structural Engineering.

  • Ensure contractor deliverables for Civil and Structural Engineering are in accordance with relevant codes & standards.

  • Participate in technical meetings & Project meetings as and when required.

  • Attend site meetings as and when required to review & approve Civil and Structural Works.

  • Review and answer to Design and Construction contractor queries.

  • Carry out necessary coordination with specialists of Total Head-quarters and all relevant approving authorities.

  • Follow up on Inspections and tests carried out by suppliers and contractors for Civil and Structural Scope.

  • Provide Construction team with technical support(s) in reviewing Construction Engineering deliverables, field surveys and in-field engineering coordination with contractor and subcontractors to ensure that Civil and Structural activities in the field are done as per the technical requirements and with acceptable quality.

  • Provide Interface Engineer and Engineering Coordinator with technical support for the interface management with other departments in TEPNG, OML58, etc.

 

ENGR. Mike DIKE, B.ENG, MNSE

  • Operations Manager, Mike is a seasoned professional in oil and gas sector. He worked worked in various oil and gas projects with SPDC, from 1995 to 2008

  • He was a Project Enginner, Estate Services of SPDC from 2008 to 2015 before joining Chuksen Engineering as senior engineer and later as operations manager.

Our Clients.

  • OUR clients indude individuals, too numerous to mention, and corporate Clients including :

  • 1 Vianky Engineering Services Ltd

  • Renold Construction Company (RCC)

  • Doumicon Nigeria Ltd( Production and Supply of load-bearing blocks for otal Nigeria Ltd (TEPNG) projects

  • Julius Berger PLC

 

EXTERNAL AUDIT.

In Line with the relevant laws of Nigeria our Company keeps records and maintains annual audited account. The current audited account for the year ended 31st has been audited and tax clearsnce issued by the board of internal revenue (FIRS).

EXTERNAL AUDITORS: MESSRS> HOPE JOSIAH & CO (Chartered ACCOUNTANTS)

NO. 14 Mbaise Street

Rumumasi Portharcourt, Rivers State

Phone Nos: 07069634847/08056863453

WHY WE ARE PREFERRED BY OUR CUSTOMERS.

  • Project Construction: We ensure that every project comes in on time and within budget.

  • Site Investigations. We carry out site investigation to ensure we come up with appropriate design/ recommendation that are fit for purse and cost effective.

  • On choice of materials – stones and blocks, we offer free recommendation to our clients. We also offer free interlocking designs to suit the property.

  • Materials Laboratory. As part of quality assurance and control we liaise with reputable laboratories for test of our sample products to assure our clients that our interlocking stones and blocks meet the appropriate standards/specifications.

  • We take spot levels at our proposed site for installation of pavestones to determine the topography for appropriate design recommendations. We also ensue 100% run off/drainage during and after installation of our tiles. We thus guarantee zero ponding, eroding and undermining of fill materials during rainfall thereby guarantying the durability of our works.

  • Control of weeds or grasses growth is reduced to the barest minimum by the superior technology employed in the manufacture and installation of tiles. Our tiles maintain a consistent minimum average guaranteed compressive strength of 25- 30 Mpa.

  • On Large sites (5000 to 20000sqm. each batch (1000sqm of our tiles) comes with a certificate of average compressive strength of 25-30 Mpa or ± 3Mpa of the specified/design strength.

  • We guarantee 5 years non deteriorating (breaking up of stones due to traffic) at sites where we are responsible for both tiles manufacturing and installation Should the above occur, we shall fix at no extra cost to the client.

  • zero slip in project time. Our word is our bond. We ensure we deliver our services and products no time/ schedule without compromising the requirements or specifications.


Back to top